FMC Corporation

Sienna Environmental Technologies was contracted by the local division of FMC, a worldwide chemical production corporation, for a recent project in the Boiler House of their Tonwanda, New York location. 

Before renovation began, Sienna was responsible for creating the project design and the preparation and negotiation of necessary variances.  Throughout the abatement project, Sienna was on site daily for project monitoring and air sampling.  Air samples were collected for each work day and analyzed by our own ELAP Certified Phase Contrast Microscopy (PCM) laboratory.